Local
Vancouver weather with Celeste Storm and traffic with Flip Torres.
Weather Full forecast
Vancouver, right now
9°C
Rain
- Feels like 7°
- Wind 14 km/h
- Humidity 91%
| Day | Conditions | High / low | Rain chance |
|---|---|---|---|
| Fri Nov 6 | Rain | 11° / 9° | 100% |
| Sat Nov 7 | Rain | 13° / 8° | 100% |
| Sun Nov 8 | Heavy drizzle | 12° / 8° | 87% |
Traffic All incidents
- MajorHighway 1: construction
Road construction from Highway 1, In Langley - District and 216th St to In Langley - District and 264th St / Hwy 13. Starting 9:00 PM PCT on Friday November 6, 2026 until 7:00 AM PCT on Tuesday November 10, 2026. From 9:00 PM to 7:00 AM PCT the next day, Monday and Friday to Sunday. Lane closures in both directions. Watch for traffic control. Last update: November 6th, 2026 at 10:30am PCT. Eastbou
- MajorHighway 1: construction
Construction work. Starting Wed May 6 until Wed Nov 25. Watch for traffic pattern change and speed reduction.
- MajorHighway 1: construction
Construction work. Starting Thu Jan 29 until Tue Dec 15. From 9:00 PM to 5:30 AM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. From 9:00 PM to 7:30 AM PST on Saturday and Sunday. Speed Limit restriction: 60km/hr. Single lane traffic in both directions.
- MajorHighway 1 (e): construction
Road construction from Highway 1, In Langley - District and 256th Street to In Abbotsford and Lefeuvre Road. Starting 12:00 AM PDT on Friday October 30, 2026 until 12:00 AM PCT on Thursday December 31, 2026. All day, every day. Closed. Detour in effect. Watch for traffic control. Expect delays. Last update: October 31st, 2026 at 2:02pm PDT. Eastbound traffic will be shifted to south of the median.
- MajorHighway 7B: construction
Bridge construction. Starting Mon Dec 1. From 7:00 AM to 5:00 PM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. Expect delays due to congestion. Watch for traffic control. Be advised: There are two lanes in each direction, width restrictions are in effect. Commercial vehicles must use both lanes. Oversized loads require permit. Work began on December 1st, 2025.
- MajorHighway 91A: construction
Bridge maintenance. Starting Thu Mar 26 until Sun Nov 15. From 9:30 PM to 9:00 AM PST on Saturday and Sunday. From 9:30 PM to 5:00 AM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. Reduced to one lane each direction. Watch for crews and expect a speed limit reduction.